Architecture Paint
NORUSEAL #6600 Fast-drying epoxy putty
- usage
- Interior dust-proofing floor primer for concrete floors
This paint is a two-component non-solvent type epoxy putty manufactured by using epoxy resin and pigment with excellent durability. It is a fast-drying epoxy putty for flooring materials suitable for crack repairs or leveling a floor upon floor painting due to its convenient scraper workability and fast-drying speed.
specification
- Paint type
- Modified epoxy / Modified amine (Two-Component)
- Drying time
-
Drying time Category 5℃ 20℃ 30℃ Set-to-touch 4 hours 2 hours 1 hour Dry-through 12 hours 5 hours 3 hours Over-coat (Min.) 24 hours 12 hours 9 hours Over-coat (Max.) 9 days 7 days 3 days Pot life 60 minutes 30 minutes 20 minutes - Thinner
- Not applicable
- Specific gravity
- Approx. 1.73 (Light green)
- Dilution ratio
- ▷No dilution ▷In case of high viscosity in the winter season, dilute within the volume ratio 1%
- Theoretical Coverage
- 1.76 ㎏/㎡ (Based on 1 ㎜)
- Solid volume ratio
- 98±2 %
- Color
- Light green
- Thickness of dried film
- According to the repair coating surface
- Mixing ratio
- Base(A)/hardener(B)=2/1 (Weight ratio)
- Gloss
- Matte
- Shelf life
- 12 months
- Packaging unit
- 15 ㎏ [Base(10㎏), Hardener(5㎏)]
how to use
- Surface treatment
- 1. Cure concrete for at least 28 days at a temperature of 21℃ and a relative humidity of 50%.
2. Completely remove the oil, moisture, sand, dust, laitance and other foreign matter from the surface and maintain surface smoothness. - Coating method
- 1. Atmosphere Temperature: 5~35℃, Surface Temperature: 40℃ or below, Relative Humidity: 80% or less
2. Please note that due to the nature of epoxy paint, discoloration and chalking may occur if exposed to the outdoor environment. - Coating conditions
- 1. Sanding should be carried out after the putty has completely dried.
2. Upon sanding, if a smooth surface is required after primary machine polishing on the putty-treated surface with SAND PAPER #100~150, the required coating surface can be obtained by performing second polishing with SAND PAPER #300 or higher.
3. Sanding and top coating before the putty dries may cause defects such as wrinkles, cracks, and poor adhesion.
Appropriate construction specifications
▷Primer : Epoxy flooring primer
▷Intermediate coating: Epoxy flooring intermediate and top coat
▷Top coat : NORUSEAL #6600(if necessary)