Architecture Paint

HOUSE COAT(INTERIOR READY MIXED PAINT) DNP-217

usage
Topcoat for steel and wood

This paint is a readt mixed matte paint with excellent durability and hiding power. It is a paint that has good wettability on the substrate, creates a mild atmosphere with a matte finish, and has excellent protective properties for the substrate.

specification

Paint type
Long oil alkyd resin / Top coat
Drying time
Drying time
Category 5℃ 20℃ 30℃
Set-to-touch 7 hours 3 hours 2 hours
Dry-hard 36 hours 15 hours 12 hours
Time required for re-coating (min.) 48 hours 24 hours 18 hours
Thinner
DR-291
Dilution ratio
Volume ratio : 10%
Specific gravity
Approx. 1.5
Theoretical Coverage
8~10㎡/ℓ (2times - 60㎛)
Solid volume ratio
Approx. 55±2%
Color
White
Thickness of dried film
60㎛
Mixing ratio
One-component
Shelf life
12 months (Dry, cool, and dark place with good ventilation)
Gloss
Matte

PRODUCT PROPERTIES (PHYSICAL PROPERTY DATA)

Film property
Hiding power and durability are excellent.
Excellent durability
Workability is excellent.
Appearance
The coating appearance is excellent.

how to use

Surface treatment
1. New metal plate: Remove dust, oil, etc. from the surface of the substrate using xylene or another proper solvent and then remove rust or forge scale by treating at blasting Sa2. Apply after coating with a corrosive undercoat, KSM-6030 class 1 or an undercoat according to the coating specifications.
2. New wood: Completely remove dust, oil, etc. Please apply sanding treatment if necessary.
3. Repair coating: After completely removing dust, oil, etc., thoroughly remove the paint film that has poor adhesion or is damaged with a wire, apply sanding for the surface of the old film to enhance adhesion.
Coating method
1. Coating can be done by either brush, roller, or airless spray coating.
2. Airless spray coating :
- Tip diameter : 0.43 ~ 0.48 mm
- Injection pressure : 143 atm
- Injection angle : 65˚
(Airless spray data are for reference only, and it is adjusted according to the coating conditions.)
3. Coating conditions : The surface of the substrate must be clean. The surface temperature should be at least 3℃ higher than the dew point to the relative humidity should be less than 85%.
Preceding and follow-up coating
1. Preceding coating : Alkyd system primer
2. Follow-up coating : Alkyd top coat