Architecture Paint
SILVER COAT(L) (ALUMINUM PAINT) DNU-210
- usage
- Aluminum paint for steel structures
This paint is a 1K aluminum paint manufactured by blending boiled oil, petroleum resin and leafing type aluminum pigment. Heat Resistance (up to 100 ℃). It is an oxidative drying paint that is mainly used for outdoor silver coating for the purpose of reflection of heat rays and prevention of water permeation with good weather resistance, water resistance and adhesion.
specification
- Paint type
- Aluminum paint for steel structures
- Drying time
-
Drying time Category 5℃ 20℃ 30℃ Set-to-touch 4 hours 2 hours 1 hour Dry-through 10 hours 6 hours 4 hours Time required for re-coating (min.) 18 hours 12 hours 8 hours - Specific gravity
- Approx. 1.0
- Solid volume ratio
- Approx. 43%
- Theoretical Coverage
- 14~16㎡/ℓ (1time - 25㎛)
- Thickness of dried film
- 25㎛
- Color
- Silver color
- Shelf life
- 12 months (Dry, cool, and dark place with good ventilation)
- Mixing ratio
- One-component
- Gloss
- Glossy
- Dilution ratio
- No dilutio
PRODUCT PROPERTIES (PHYSICAL PROPERTY DATA)
- Film property
- Heat resistance (up to 100℃), weather resistance, humidity resistance, and adhesion are superior.
- Excellent workability
- Workability is excellent.
- Appearance
- The condition of dry film appearance is excellent.
how to use
- Surface treatment
- 1. Completely remove rust, oil, dust and other contaminants from the surface of the substrate. It is recommended to paint after applying ready mixed/enamel anti-corrosive undercoat 1-2 times to the surface where rust or oil and other contaminants from the surface of the substrate are completely removed.
2. The surface to be coated must be clean. The surface temperature should be at least 3℃ higher than the dew point to avoid the condensation of water, and the relative humidity should be less than 85%. - Coating method
- 1. Brush, roller coating
2. Airless spray coating :
- Tip diameter : 1.3 ~ 1.5 mm
- Injection pressure : 2 ~ 5 Pa
- Spray time : 2 ~ 3times(back and forth)
(Airless spray data are for reference only, and it is adjusted according to the coating conditions.)
3. Coating conditions : The surface of the substrate must be clean. The surface temperature should be at least 3℃ higher than the dew point to the relative humidity should be less than 85%. - Preceding and follow-up coating
- 1. Preceding coating : Alkyd anti-corrosive primer
- Remarks
- ※ It is a KS mark product corresponding to KSM-6020 class 3.