Architecture Paint

EASY CLEANING

usage
Finish coating for interior such as concrete, cement mortar, plasterboard, etc.

As this paint is designed based on a special emulsion resin having a dense structure and pigment, it is easy to remove pollutants. Moreover, it is a highly functional interior water-based paint with the excellent appearance of having a soft egg-shell luster. It also contains antimicrobial agents and has excellent antimicrobial effects. EASY CLEANING not only has no smell of solvent, but also has a good hiding and coating appearance, and can be easily handled by anyone.

specification

Paint type
Acrylic emulsion water-based interior / Top coat
Drying time
Drying time
Category 5℃ 20℃ 30℃
Dry-hard 3 hours 2 hours 1 hour
Time required for re-coating (min.) 6 hours 3 hours 2 hours
Thinner
Tap water(dilution rate: up to 10%, volume ratio)
Coating Method
Brush, roller, spray coating
Specific gravity
Approx. 1.3(based on white color)
Solid volume ratio
Approx. 35%(based on white color)
Theoretical Coverage
5.8㎡/ℓ/2times
Thickness of dried film
60㎛ (2coats recommended)
Re-coating interval
20℃, sufficient ventilation for a minimum of 4 hours
Color
White, other colors
Gloss
Egg-Shell
Storage and preservation
12 months (Dry, cool, and dark place with good ventilation, room temperature 5℃~30℃, humidity less than 80%)

PRODUCT PROPERTIES (PHYSICAL PROPERTY DATA)

Delicate appearance
Delicate appearance with egg-shell luster.
Excellent film property
Due to the dense film composition, stain resistance and graffiti prevention and removal functions are excellent.
Eco-friendly properties
It is a LOW VOC, harmful heavy metal FREE and APEO (kind of environmental hormone) FREE eco-friendly water-based paint with little odor during painting.

how to use

Surface treatment
1. The material should be sufficiently cured (cured more than 30 days at 20℃)
2. Laitance, dust, oil and other contaminants on the surface must be completely removed.
3. The proper pH of the material must be less than 9, and the percentage of moisture content must be less than 6%.
4. The gaps and grooves on the surface must be filled with exterior water-based putty, and surface adjustment should be made before coating.
Coating method
1. Primer
① After surface treatment, if necessary to prevent poor adhesion and discoloration if the condition of the concrete and the old coating are poor (absorption difference, cement elution, peeling of the old coating, etc.), dilute water-based permeable sealer DNX-4001 and apply once with a roller or brush to a dry film thickness of about 15㎛.
② For areas where the absorption of the surface is severe, apply once more.
2. Top coat
① After at least 3 hour at 20℃ after primer, apply top coat to get a dry film thickness of 60㎛ with a brush, roller or spray twice.
② At this time, if necessary, apply by diluting with water to less than 10% for the one coat and less than 5% for the two coat.
③ After 2 coats, the re-coating interval is at least 3 hours after the first top coating at 20℃.