Floor Coating

This paint is a two-component transparent epoxy paint made mainly of epoxy resin and polyamide resin, which is a top coat clear suitable for concrete. This paint is also excellent in abrasion resistance and adhesion, having good water resistance and chemical resistance.

specification

Paint type
Modified epoxy / Polyamide (Two-Component)
Drying time
Drying time
Category 5℃ 20℃ 30℃
Set-to-touch 2 hours 1 hour 40 minutes
Dry-through 30 hours 15 hours 10 hours
Over-coat (Min.) 32 hours 18 hours 12 hours
Over-coat (Max.) 1 month 15 days 8 days
Pot life 16 hours 12 hours 8 hours
Thinner
DR-100, DR-100L
Dilution ratio
▷Brush, roller coating: less than 5%
Specific gravity
Approx. 0.97 (Transparent)
Theoretical Coverage
0.09 ㎏/㎡ (10.5㎡/ℓ)
Solid volume ratio
42±3 %
Color
Transparent
Thickness of dried film
40 ㎛
Mixing ratio
Base(A)/hardener(B)=2/1 (volume ratio)
Gloss
Glossy
Shelf life
12 months
Packaging unit
16L (Compounds)
Flash point
16℃

how to use

Surface treatment
1. Cure concrete for at least 28 days at a temperature of 21℃ and a relative humidity of 50%.
2. Completely remove the oil, moisture, sand, dust, laitance and other foreign matter from the surface and maintain surface smoothness.
Coating method
1. Reinforce cracks, crevices, and joints between walls and floors with an epoxy putty after primer.
2. Apply smoothly to the base surface using a roller, etc. after evenly mixing the main agent and hardener.
Appropriate construction specifications
▷Primer : CLEANPOXY CLEAR PRIMER, CLEANPOXY PENETRATED PRIMER DNY-200,
▷Intermediate coating : Epoxy colored paint(if necessary)
▷Top coat : Solvent-based epoxy clear top coat
Coating conditions
1. Atmosphere Temperature: 5~35℃, Surface Temperature: 40℃ or below, Relative Humidity: 80% or less
2. Please note that due to the nature of epoxy paint, discoloration and chalking may occur if exposed to the outdoor environment.