Floor Coating
CLEANPOXY CLEAR PRIMER Penetrated epoxy primer
- usage
- Interior dust-proofing floor primer for concrete floors
This paint is a 2K clear epoxy paint made mainly of epoxy resin and polyamide resin. It is especially suitable for concrete because of its excellent permeability. In particular, it enhances the strength of the concrete mortar surface and improves adhesion between the substrate and the subsequent paint.
specification
- Paint type
- Modified epoxy / Polyamide (2-Component)
- Drying time
-
Drying time Category 5℃ 20℃ 30℃ Set-to-touch 3 hours 1 hours 30 minutes Dry-through 20 hours 8 hours 6 hours Over-coat (Min.) 24 hours 8hours 6 hours Over-coat (Max.) 1 month 15 days 8 days Pot life 12 hours 5 hours 2 hours - Thinner
- Not Applicable
- Specific gravity
- Approx. 0.94 (Clear)
- Dilution ratio
- ▷No dilution
- Theoretical Coverage
- 0.15 ㎏/㎡ (6.6㎡/ℓ)
- Solid volume ratio
- 33±3 %
- Color
- Clear
- Thickness of dried film
- 50 ㎛
- Mixing ratio
- Base(A)/hardener(B)=4/1 (Weight ratio)
- Gloss
- Glossy
- Shelf life
- 12 months
- Package unit
- 16L (Compounds)
- Flash point
- 16℃
how to use
- Surface treatment
- 1. Cure concrete for at least 28 days at a temperature of 21℃ and a relative humidity of 50%.
2. Completely remove the oil, moisture, sand, dust, laitance and other foreign matter from the surface and maintain surface smoothness.
3. The substrate with severe absorption of primer due to poor concrete should be reinforced by additional coating to exhibit excellent adhesion.
4. For high-strength concrete (260㎏/㎠ or higher), blasting treatment should be carried out. - Coating method
- 1. Reinforce cracks, crevices, and joints between walls and floors with an epoxy putty after primer.
2. Apply smoothly to the base surface using a roller, etc. after evenly mixing the base and hardener.
Appropriate construction specifications
▷Primer : CLEANPOXY CLEAR PRIMER
▷Top coat : Epoxy system, urethane system, PVDF paint - Coating conditions
- 1. Atmosphere Temperature: 5~35℃, Surface Temperature: 40℃ or below, Relative Humidity: 80% or less
2. Moisture content in the concrete: 6% or less