Floor Coating

NR MVB(MOISTURE VAPOR BARRIER) PRIMER

usage
Epoxy primer for concrete surfaces

"This product is 2K transparent epoxy primer made mainly of epoxy resin and modified amine resin.
It is recommended to use as primer on the floor with its excellent adhesion, permeability, water resistance and chemical resistance. NR MVB meets the performance requirements of ASTM F3010-13 Standard Practice for Two-Component Resin Based Membrane-Forming Moisture Mitigation Systems for Use Under Resilient Floor Coverings."

specification

Paint type
Modified epoxy / Modified amine (2-Component)
Drying time
Drying time
Category 5℃ 20℃ 30℃
Set-to-touch 8 hours 4 hours 3 hours
Dry-through 24 hours 6 hours 4 hours
Over-coat (Max.) 2 days 1 day 1 day
Pot life 25 minutes 10 minutes 5 minutes
Thinner
Not Applicable
Dilution ratio
▷No dilution ▷In case of high viscosity in the winter season, dilute within the volume ratio 1%
Specific gravity
Approx. 1.1
Theoretical Coverage
0.11 ㎏/㎡ (9.8㎡/ℓ)
Solid volume ratio
98±2 %
Color
Transparent
Thickness of dried film
400~500 ㎛
Mixing ratio
base(A)/hardener(B)=2/1 (volume) base(A)/hardener(B)=100/45 (weight)
Gloss
Glossy
Shelf life
12 months
Package unit
base 8.6 ㎏ hardener 3.94 ㎏

how to use

Surface treatment
1. Cure concrete for at least 28 days at a temperature of 21℃ and a relative humidity of 50%.
2. Completely remove the oil, moisture, sand, dust, laitance and other foreign matter from the surface and maintain surface smoothness.
3. The substrate with severe absorption of primer due to poor concrete should be reinforced by additional coating to exhibit excellent adhesion.
4. For high-strength concrete (260㎏/㎠ or higher), blasting treatment should be carried out.
Coating method
1. Reinforce cracks, crevices, and joints between walls and floors with an epoxy putty after primer.
2. Apply smoothly to the base surface using a roller, etc. after evenly mixing the base and hardener.
3. Add the hardener to the base and use after evenly mixing for 3-5 minutes with a power stirrer.
Appropriate construction specifications
▷Primer : : NR MVB
▷Top coat : Epoxy system, urethane system
Coating conditions
1. Atmosphere Temperature: 5~35℃, Surface Temperature: 40℃ or below, Relative Humidity: 80% or less
2. Moisture content in the concrete: 6% or less