Floor Coating
NR MVB(MOISTURE VAPOR BARRIER) FAST PRIMER
- usage
- Epoxy primer for concrete surfaces
- data
- NR MVB FAST TDS.pdf
This product is a two component transparent epoxy primer made mainly of epoxy resin and modified amine resin. It is suitable as a floor undercoat, its excellent adhesion, permeability, water resistance and chemical resistance.
specification
- Paint type
- Modified epoxy / Modified amine (2-Component)
- Drying time
-
Drying time Category 5℃ 20℃ 30℃ Set-to-touch 6 hours 2 hours 1 hour Dry-through 12 hours 3 hours 2 hours Over-coat (Max.) 1 day 6 hours 4 days Pot life 25 minutes 10 minutes 5 minutes - Thinner
- Not Applicable
- Dilution ratio
- ▷No dilution ▷In case of high viscosity in the winter season, dilute within the volume ratio 1%
- Specific gravity
- Approx. 1.1
- Theoretical Coverage
- 0.11 ㎏/㎡ (9.8㎡/ℓ)
- Solid volume ratio
- 100%
- Color
- Transparent
- Thickness of dried film
- 400~500 ㎛
- Mixing ratio
- base(A)/hardener(B)=2/1 (volume) base(A)/hardener(B)=100/45 (weight)
- Gloss
- Glossy
- Shelf life
- 12 months
- Package unit
- Part A 1gallon, Part B 1gallon
how to use
- Surface treatment
- 1. Cure concrete for at least 28 days at a temperature of 21℃ and a relative humidity of 50%.
2. Completely remove the oil, moisture, sand, dust, laitance and other foreign matter from the surface and maintain surface smoothness.
3. The substrate with severe absorption of primer due to poor concrete should be reinforced by additional coating to exhibit excellent adhesion.
4. For high-strength concrete (260㎏/㎠ or higher), blasting treatment should be carried out. - Coating method
- 1. Reinforce cracks, crevices, and joints between walls and floors with an epoxy putty after primer.
2. Apply smoothly to the base surface using a roller, etc. after evenly mixing the base and hardener.
3. Add the hardener to the base and use after evenly mixing for 3-5 minutes with a power stirrer.
Appropriate construction specifications
▷Top coat : Epoxy system, urethane system - Coating conditions
- 1. Atmosphere Temperature: 5~35℃, Surface Temperature: 40℃ or below, Relative Humidity: 80% or less
2. Moisture content in the concrete: 6% or less