Heavy Duty Coating

DHDC-5000HB Epoxy intermediate coating, high build

usage
Intermediate coatings for undercoated steel structures and concrete surfaces

This paint is a two-component clear epoxy paint made mainly of epoxy resin and polyamide resin. It is an primer paint suitable for concrete because of its excellent permeability. This product is excellent in permeability, water resistance, and chemical resistance compared to general epoxy clear undercoats. It is an eco-friendly paint with low VOC content, satisfying ASTM D 5144 and SNE 5144 specifications of protective coating technology criteria for nuclear power plants.

specification

Paint type
Epoxy / Intermediate coating / High build (Two-Component)
Drying time
Drying time
Category 5℃ 20℃ 30℃
Set-to-touch 2 hours 1 hour 30 minutes
Dry-hard 18 hours 12 hours 6 hours
Over-coat (Min.) 24 hours 14 hours 8 hours
Maturation time 1 hour 30 minutes 15 minutes
Pot life 10 hours 5 hours 3 hours
Thinner
DR-100
Dilution ratio
▷Brush, roller coating: less than 15% ▷Airless, spray coating: less than 10%
Specific gravity
Approx. 1.4
Theoretical Coverage
6.5 ㎡/ℓ (1time - 100㎛)
Solid volume ratio
Approx. 65±1%
Color
Gray, other colors
Thickness of dried film
100㎛
Mixing ratio
Base(A)/Hardener(B)=6/1 (Volume ratio)
Flash point
At least 25℃
Gloss
Matte
Shelf life
12 months (Dry, cool, and dark place with good ventilation)

PRODUCT PROPERTIES (PHYSICAL PROPERTY DATA)

Epoxy intermediate coating
A two-component epoxy high-build intermediate coating greatly improving the durability of the entire film
Excellent film property
Adhesion, water resistance, anti-corrosive properties and abrasion resistance are superior

how to use

Surface treatment
1. Completely remove oil, moisture, sand, dust, and other foreign matter from the surface to be coated.
2. Sufficiently dry the surface to be coated before coating.
3. The welded parts and corners need to be cleaned before coating.
Coating method
1. Although coating can be done by either brush or airless spraying, airless spray coating is best.
2. Airless spray coating:
- Tip diameter : 0.021"~0.031"
- Injection pressure : More than 3000 P.S.I(210㎏/㎠)
- Store the coating equipment after cleaning with an exclusive thinner immediately after use.
Preceding and follow-up coating
1. Preceding coating : Epoxy system primer, inorganic zinc system, epoxy zinc system paint
- Upon coating on the inorganic zinc paint, a mist coat is required.
2. Follow-up coating : Epoxy system, urethane sysstem, PVDF paint
Remarks
1. Sufficient performance after last coating is achieved after drying for 7 days at 20℃.
2. For coating areas exposed to the outside, yellowing and chalking may occur in a short period of time due to
the effect of sunlight. Upon coating for areas exposed to the outside, be sure to apply top coat.