Industrial Coating
ECO UV SANDING SEALER
- usage
- UV-curable intermediate coating for plywood floors
ECO UV Sanding Sealer is a UV-curable intermediate coating for wooden floors that consists of light-curable oligomer, photoinitiator, reactive acrylic monomer, extender pigment, and additives. This UV-curable intermediate coating for wooden floors features superior grinding, adhesion, foaming, and transparency as well as outstanding physico-chemical film properties.
specification
- Paint type
- UV-curable paint
- Product features
- 1. Outstanding grinding 2. Outstanding roll workability and transparency
- Exterior
- Semi-transparent liquid
- Color
- Transparent
- Viscosity
- 100 - 130 KU (25 ℃)
- Specific gravity
- 1.2 ± 0.05 (25 ℃)
- Solid content
- Over 99 %
- Coverage
- 15 - 35 g/㎡
- UV-curing conditions
- 450 mJ/㎠ or above
- Shelf life
- 6 months
how to use
- Surface treatment
- Substrate grinding
Perform grinding using a sander and the sand paper with 120 - 220 eyelets and remove the dust with a brush. - Coating method
- 1) Roll sufficient amount of water-soluble isolator onto DRC (direct roll coater) (application amount 8 - 10 g/㎡)
2) Dry with hot air for 30 - 40 seconds at 60 - 80 ℃ and dry with a 120 - 150 mJ/㎠ UV irradiator.
3) Roll sufficient amount of UV W/S for Wooden Floor onto RRC (reverse roll coater) and adjust the application amount (30 - 40 g/㎡).
4) Adjust paint viscosity using a thermostat.
5) Use 1 - 2 UV lamps to pre-dry the paint (120 - 150 mJ/㎠).
6) Roll sufficient amount of UV S/S for Wooden Floor onto DRC (direct roll coater) and adjust the application amount (15 - 20 g/㎡).
7) Use 1 - 2 UV lamps to pre-dry the paint (120 - 150 mJ/㎠).
8) Adjust paint viscosity using a thermostat.
9) Roll sufficient amount of UV S/S for Wooden Floor onto CRC (combination roll coater) and adjust the application amount (25 - 35 g/㎡).
10) Use 4 - 5 UV lamps to dry the paint completely (At least 450 mJ/㎠).
11) Adjust paint viscosity using a thermostat.
12) Use a sander and the sand paper with 320 - 400 eyelets to perform grinding.
13) Roll sufficient amount of UV TOP for Wooden Floor onto DRC (direct roll coater) and adjust the application amount (8 - 10g/㎡).
14) Use 1 - 2 UV lamps to pre-dry the paint (120 - 150 mJ/㎠).
15) Roll sufficient amount of UV TOP for Wooden Floor onto DRC (direct roll coater) and adjust the application amount (8 - 10g/㎡).
16) Use 5 - 6 UV lamps to dry the paint completely (At least 500mJ/㎠).